-
Keysight N2804A: High-Voltage Differential Probe for Precision Measurements
Keysight N2804A High-Voltage Differential Probe: 300 MHz bandwidth, 100:1 attenuation, 4M ohm/4 pF input impedance, 30cm leads, high-voltage measurement, differential probe, Keysight Technologies.
$2,442.00
Shop By Department
- Calibration Instruments
- Dimensional Measuring Tools
- Electrical Test Instruments
- Environmental Testing
- Power Quality
- Pressure Measurement
- Preventative/Maintenance
- Process Instruments
- Recorders/Data Loggers
- Scales and Balances
- Temperature Measurement
- Torque
- Oscilloscopes
- Power Supplies
- Spectrum Analyzers